Two different tools
| Helical piles | Ground screws | |
|---|---|---|
| Geometry | Steel shaft with one or more helix plates, or continuous flight | Tapered shaft with a forged or cast threaded tip |
| Best ground | Soft clay, peat, wetlands, frost-heave zones; bears on deep strata | Caliche, dense gravel, glacial till, rocky hillsides, steep slopes |
| How capacity develops | Bearing on the helix plates below weak layers | Thread engagement and shaft friction in dense ground |
| Typical depth | Deeper; extended until torque target is met | Shallower, 5–8 ft typical |
| Rock | Not for competent rock | Pilot-drilled into soft rock where needed |
Torque verifies capacity
Installation torque correlates with capacity: Qult = Kt × T, where Kt is an empirical factor that falls as shaft diameter rises (about 10 ft⁻¹ for small square-shaft helicals, lower for larger round shafts). Logging torque on every pile gives a capacity check across the site, not just at the test locations. Load tests on representative piles calibrate Kt for the site. See ASTM D3689/D3966 testing.
Why EPCs pay the premium
- No refusal adder. Screws go through ground that would stop a driven pile, so there is no pre-drill, grout or rig standby.
- No concrete and no cure. Racking can load immediately after install.
- Slopes and grade. Screws handle undulating terrain with less grading.
- Removable. Screws back out at decommissioning, which can lower the end-of-life bond and restoration cost.
Installed pricing
The unit premium over driven steel is the reason screws lose on clean sites and win on rocky ones. The crossover is usually around 25–30% refusal. Test it with your numbers in the estimator.
IRA domestic content
Ground screws and helical shafts are structural steel foundation items under IRS Notices 2023-38, 2024-41 and 2025-08, so they need 100% U.S. melted and poured steel for the domestic content bonus. Confirm the mill origin of the shaft tube or bar, not just the final fabricator. MTR checklist →